- P21 - Data
- P21 - EDI
- P21 - Project
- P21 - Process Issues
- P21 - Dynachange
- P21 - Forms
- P21 - Performance
- P21 - Report/Portal
- P21 - General
- Unassigned
Create A Drill Down Using Dynachange Navigator
1. RMB click the field you want to create the drill down in (From). Dynachange > Dynachange Navigator > and select 'Make field a drill source'
2. RMB click the field within the window that should be populated with the data from the source, Dynachange > Dynachange navigator > and select 'Make field a drill target'
You should now be able to drill into the field to open up the related window and it will populate the value from the source field.
3. Use the Dynachange Organizer Navigator to manage the drill downs.
Files | ||
---|---|---|
DataImage19.png 58.7 KB |
||
DataImage2.png 25.8 KB |
||
DataImage58.png 72.3 KB |
||
DataImage58.png 41.7 KB |